Green Infrastructure

Detention & Retention Design (IGSIC-02)


Description
Take a deep dive into the design of detention and retention basins in this virtual training. Stormwater experts walk through all aspects of basin design, including site feasibility, structural features, treatment train positioning, volume calculations, and landscaping.
Content
  • WELCOME
  • Introduction
  • User Profile Survey
  • MODULE 1 - BASIC PRINCIPLES
  • Video - Module 1
  • Slides - Module 1
  • MODULE 2 - SITE FEASIBILITY
  • Video - Module 2
  • Slides - Module 2
  • MODULE 3 - PRETREATMENT & INLETS
  • Video - Module 3
  • Slides - Module 3
  • MODULE 4 - RECREATION FEATURES
  • VIdeo - Module 4
  • Slides - Module 4
  • MODULE 5 - DESIGN CALCULATIONS
  • Video - Module 5
  • Slides - Module 5 (Part 1)
  • Slides - Module 5 (Part 2)
  • MODULE 6 - TREATMENT TRAIN
  • Video - Module 6
  • Slides - Module 6
  • MODULE 7 - DESIGN ALTERNATIVES & RETROFITS
  • Video - Module 7
  • Slides - Module 7
  • MODULE 8 - VEGETATION & LANDSCAPING
  • Video - Module 8
  • Slides - Module 8
  • MODULE 9 - CASE STUDIES
  • Video - Module 9 (Part 1)
  • Video - Module 9 (Part 2)
  • Slides - Module 9
  • MODULE 10 - CONSTRUCTION SEQUENCING
  • Video - Module 10
  • Slides - Module 10
  • MODULE 11 - INSPECTION & MAINTENANCE
  • Video - Module 11
  • Slides - Module 11
  • Handouts
  • Design Review Checklist for Dry or Dry ED Detention Ponds.xlsx
  • Project Drainage Report Checklist.xlsx
  • Design Review Checklist for Wet Detention Ponds.xlsx
  • Storm Design Spreadsheets.xlsx
  • Stormwater Summary Data Sheet.docx
  • Inspection & Maintenance Guide for Stormwater BMPs.pdf
  • ISWMM Design Standards Chapter 1.pdf
  • ISWMM Chapter 9-01.pdf
  • ISWMM Chapter 9-02.pdf
  • ISWMM Chapter 9-03.pdf
  • ISWMM Chapter 9-09.pdf
  • ISWMM Chapter 9-10.pdf
  • ISWMM Chapter 9-11.pdf
  • ISWMM Chapter 9-12.pdf
  • ISWMM Chapter 9-14.pdf
Completion rules
  • All units must be completed
  • Leads to a certificate with a duration: 59 months, 28 days